Home / Efficiency

Posts Tagged ‘Efficiency’

Our Annual 5 S Lean Cleanup

Thursday, February 18th, 2010 by ksmith

Each year at Setpoint as we begin the New Year we go through the 5 S process in our office.  We sort through everything at our desks, the shop, closets, and in the office in general to clear out those things that we no longer need or use.  Then we straighten everything up and rearrange stuff to clean things out and make it easier to find items that we use. 

This year as I was preparing to lead the 5 S cleanup the decision was made to cleanup our Intranet instead.  We got rid of so much over the last few years and hadn’t really accumulated much since our last cleanup.  However, our Intranet is about 5 or 6 years old and instead of cleaning old files off as they were no longer needed and keeping the architecture up to date as we went along, new links and pages were added instead.

If you ask the CEO to find a document on the Intranet he won’t be able to.  He tells me all the time that it’s confusing and that it takes too many clicks to find anything.  How in the world do you start sorting through the Intranet?  I started by making a list of every page and document that we had on there.  We have over 500 items on our Intranet, I had no idea.  Some of those items were duplicates where the same document was added into two different sections.  At least I knew what I needed to sort through.  It just goes to show that when you don’t pay attention to something, it can get totally out of hand as everyone keeps adding things that are not necessary.

The next thing I did was to ask everyone what documents they actually use from our Intranet.  For the most part, there were four documents that most people use.  The rest are either once in a while or they are not used at all.  That was an eye opener, why do we have so many documents available if no one ever even looks at them. 

Now it is time to straighten everything up.  Those items that are used will need to be grouped with like items so that within three clicks you can find any document on our Intranet.  I also need to come up with better category names so that by looking at it you will know what is included, rather than generic terms like “Forms”.

So I’m off to get these items straightened up.  Hopefully the next stage in this process will be easy.

5 S Process in an Assembly Shop

Thursday, December 10th, 2009 by ksmith

Recently we talked about the 5 S process developed from the Toyota Production System.  Some believe that the 5 S process can only be implemented in a manufacturing environment and do not see the benefits of using this process to improve their work environment.  Here at Setpoint we have our design engineers in an office environment and our assembly technicians in a shop environment with both areas using the 5 S process. 

We made a video and put it out on YouTube to walk through our shop and show how the 5 S Process can be implemented in an assembly environment where we build one machine and ship it, then build a completely different machine.

Sustain - the Fifth “S” of the 5 S System

Thursday, November 12th, 2009 by Ken

After the first four S’s from the Toyota Production Systems improvement process have been implemented, the most important work begins.  If you have gone to all the work of setting up the system you must sustain or even improve on it to keep the system working properly.  Things change and you need to be flexible.  If something is not working the way you would like change it and keep changing it until you are satisfied. 

For instance, you should be able to tell at a glance if all the tools are in they place or if your hardware is running low, you may have to walk around and check some key spots each night to make sure the system is being used properly.

We are all very quick to form habits and by repeating these steps over and over it will be no time at all and your employees will be telling you when parts are low or things are not where they belong.

The 5 S System may seem like a lot of work at first and it is, but the benefits far out weigh your initial investment.

Standardize- The Fourth “S” of the 5 S System

Thursday, November 5th, 2009 by Malorie

Now that the first three 5S’s (Sort, Straighten, and Shine) have been implemented, the next step is to concentrate on standardizing best practices in your work environment, also known as the Japanese term Seiketsu. This involves creating a consistent approach for carrying out tasks and procedures amongst all employees and departments. Orderliness is the core of standardization.

If the first three steps have been followed correctly then standardization should fall right into place with the help of all involved.  Standardization receives the most success when everyone knows their role and rules of their area and therefore can be involved in the development of these standardized rules because they are valuable for the information they deal with on a day to day basis. In the end, everyone should know exactly what their job responsibilities are and they should know exactly how to perform as well.

This process works very well at Setpoint because we work in a very fast paced and schedule driven environment where we usually can’t afford to lose a day when someone has an unforeseen absence. Therefore by following the 5 S system there is usually someone able to step in and pick up right where the last person left off without having to ask a thousand questions and wasting time looking for parts or tools.

SHINE - the Third “S” of the 5 S System

Thursday, October 29th, 2009 by John

Following Sort and Straighten in the Toyota Production System 5 S System is Shine.  Shine is going through and cleaning up the work area.  At the end of the day each person needs to clean up their workstation, sweep the floors, clean off their desk, and return tools to their proper place.  This should be incorporated into every day routines.

When you take the time to “shine”, you are preparing for the future. Today’s workplace is full 0f inconsistencies and infractions.  There needs to be order and organization desperately.   Without the shine chaos starts to take control. 

So when you use it be sure to clean it by puting it back away every day so as to make everybody’s everyday tasks easier to complete.  That will make the world turn smoother than it did before.

To catch up on the series, here are links to the other posts:

Overview of the 5 S System

Sort - the First “S” of the 5 S System

Straighten - the Second “S” of the 5 S System

Standardize- the Fourth “S” of the 5 S System

Sustain - the Fifth “S” of the 5 S System

STRAIGHTEN - The Second “S” of the 5 S System

Monday, October 26th, 2009 by Bryan

The first principal of the 5S system, Sort, is where you take and identify those items that are needed for you to accomplish your work.  Those necessary items are what we will now focus on.  Straighten, or Setting in Order, is the second principal of the 5S system.  In order for you to have an efficient work place, you need to have the correct tools and supplies close at hand and you need to be able to quickly find them.  Everything must have its place, and be in its place.

Looking at the desks in our building, mine has to be the most disorganized.  When I am done with a book or an item it is pushed out of they way rather than placed back where it belongs.  It’s a good thing the engineers are moved around so my desk gets cleaned up once in a while.  I’m forced into compliance, although I’m no where near as bad as someone who worked here several years ago.  On the other hand, my garage at home…  let’s just say that sometimes it takes more time to find the tools that I need for a project than it does to complete the project.  This principal of 5S is all about making your work area more efficient.  Setting up work stations or areas for work and having the correct tools and supplies in those areas are keys to becoming more efficient in the tasks that you do.

In the area that you have to work set aside areas for the storage of supplies and tools.  Keep the tools that you need more often closer to hand than those that you use less frequently.  Set aside a place for them and label it.  Shadow boards or cut outs in foam in your tool box are good examples of this.  Doing this allows you to quickly find the tool that you need.  It also allows you to know at a glance if you are missing any tools needed for the job at hand.  Totes or bins can be labeled and placed in the areas that are needed.  If you are working on an assembly line only have the tools and supplies that you need in your area.  Arrange them in a fashion that facilitates the work flow.  Minimize the clutter. Put tools in their designated place after they are used.  Keep a clean and organized work area.

By organizing and cleaning your area, you can maximize your efficiency and increase your work flow.   Greater efficiency and more work done makes for happy people.  For me this means more time to do an extra item on the honey-do list at home.  And this does make the Boss happy.

SORT - The first “S” of the 5 S System

Monday, October 19th, 2009 by Bob

In using the Toyota Production System to improve your organization you need to integrate the 5 S processes from your desk to the production floor. The first “S” is to sort out what is and is not needed to do the required work in the work area.

Sorting the things you need to do your job on your desk, in receiving, in the production area, on the assembly floor, and any work area helps you work more efficiently and less prone to misplaced parts and tools. What do you sort? What do you need to do the job or task including tools, parts, and paperwork? If you don’t need it to do your job, it shouldn’t be in your workspace. Not only do you need to sort out what you need, but evaluating the proper quantities of each is also very important. One way to determine what you should have at your workspace is to use the 24-48 hour rule. If you are not going to need it in the next 24-48 hours, it doesn’t need to be in your workspace.

Here at Setpoint, we sort just about everything that comes in the doors, including our engineers. When parts are received a label is attached and the part is placed in a subassembly tote and the tote is placed on the projects rack. When there are enough parts for assembly to begin, the rack is moved to a specific assembly area designated to that project. The assemblers can go grab a tote and take it to their work area to begin assembly. When the assembler needs screws, wire, air hose, or a tool he can go to that rack or cabinet where everything is sorted by type and size. He takes only what he needs and continues working. When he reaches a stopping point or completes the assembly, everything is placed back in the tote and back on the rack. He then grabs the next subassembly tote and begins the build process again. At the end of the day everything is put back in its place, including totes, tools, and paperwork so it is ready to go the next day.

This sorting process has allowed us to be very efficient at building our projects. Any one assembler can go to any project and determine what can and needs to be worked on. We know where to find any tool, wire, hose, or fastener without searching the shop floor. I have worked at other companies where this sorting was “sort of” used (pun intended), and it makes for a long day when you are searching for the part or tool you need because it was not returned to its sorted place.

As I mentioned before, not only do we sort the products coming in our door, but we sort our engineers as well. Depending on our current projects, our engineers get sorted into different teams to utilize their talents and experiences. Yes, this means moving our computers and our stuff from one area to another. I have been sorted at least five times in just over three years. Sometimes this can be a pain, but this sorting helps the team’s communication and makes the design process much more efficient. It also gives us a chance to sort out the accumulation of stuff from our workstation and place it in the proper place–the garbage.

Toyota Production System (TPS) - How it Influences Design

Thursday, August 27th, 2009 by Nate

You have probably heard a lot about Lean Manufacturing systems like the Toyota Production System and how it can transform a manufacturing plant by eliminating waste, but you may not know that the principals of the Toyota Production System can also apply to the design process.

One of the first steps in the Toyota Production System is to define what adds value for the customer. During the design we try to completely define what the customer wants. What problems are they trying to solve? What needs are they looking for the machine or product to fulfil? By fully defining the scope of the project, you will end up with a set of expectations that are agreed upon so you know what to design and the customer knows what they can expect to receive. This will help eliminate the “Takes What It Takes” (TWIT) attitude that can lead to overages on time and materials.

The next step is to design for manufacturing. Here at Setpoint, we are always looking for ways to make our machines better, faster, stronger, and less expensive both for us and for our customers. We do this by trying to eliminate complicated parts and assemblies, incorporating features like Poke-Yokes (error proofing) and Single Minute Exchange of Dies tooling, and learning from the best practices from past projects.

One of the final steps in the design process is the Post Project Review. This meeting brings together all of the parties involved with the project to reflect upon the things that went right and the things that didn’t go exactly to plan. It includes the design team, project management, purchasing/receiving, electrical and mechanical assembly, the programmers, accounting, and the CEO. These meetings help us to capture all of the “lessons learned” from the project and use that knowledge on the next projects. Reflecting on past projects is a core value of the Toyota Production System and allows Setpoint to build on our successes and prevent us from repeating our mistakes.

At the heart of it, the Toyota Production System is a method to speed up processes, reduce waste, and improve quality. Applying these principles to the design process, allows you to improve quality, become more efficient and provide exactly what the customer is looking for. Happy Designing!

Deciding on the Direction for your Company

Thursday, August 6th, 2009 by Brad

Companies that remain static and don’t evolve will eventually lose their profit margins and sink into oblivion. At Setpoint, as we try and adapt to the changing landscape I have noticed several things in dealing with deciding our company’s direction.

First, change is hard. It is much easier to continue doing what has been done in the past, even if it is not getting the results it used to, and rarely have I seen an idea that just works right out of the gate.

You can’t do everything, and if you try to, it will result in spreading your resources (money, time, people) so thin that you cannot be successful at anything. One of the hardest things is, deciding what not to do. It is difficult because you tend think that you are potentially leaving money on the table, and you may be – but you are doing it to pursue a better idea with more potential.

We have found that some feel more passionately about an idea than others, so we have developed a rule that is simply “whoever has passion about an idea gets less than 50% of the vote”. This helps us make more objective decisions. Key message is, don’t be so in love with a strategy or idea that you can’t dispose of it when all the facts point that way.

You never have perfect information before a decision needs to be made. As a result, assumptions are made in order to make progress. The problem is, unless those assumptions are tracked and noted they tend to become facts over time, and often those assumptions are wrong. You have to revisit assumptions to validate, modify, or eliminate them to reflect new information you now have. Not doing so can lead to less than desirable outcomes.

At Setpoint we try and follow the philosophy of “fail faster”. In other words, if something is not going to work the sooner you identify it the cheaper it is for the company in terms of money, time, and people. Most ideas can be validated or eliminated without much cost or time if the key issues have been correctly identified. The few key remaining ideas can then claim your valuable resources.

The shorter iteration cycles the better; the clearer the objectives, the easier it will be to identify the key issues that need to be proved out in order to validate the direction.

These are some of the techniques we are using at Setpoint to decide our companies direction.

This process is an ongoing part of a healthy company’s life. So get on with it.

Machine Assembly - What Works Best

Thursday, July 30th, 2009 by Ken

After working in a shop for over 30 years, I have found that following a process when it comes to assembling a machine works the best. 

First, it always helps to sit down with the designer and find out what kind of things to watch for, such as customer constraints or hazardous locations etc.  It is a must to have a complete print package before you start to assemble.  You need to look it over to find the best place to start. 

Subassemblies can be built and then installed on the machine later when the longer lead time items come in.  Most of the time the parts that come in first will be electrical and small parts for subassemblies; this allows you to assemble and wire without having the rest of the machine.

Next, look for assembles that can be built that won’t have to be disassembled in order to install on the machine.  This will help cut down on the time spent on assembly.  I also recommend you build the subassemblies with wire labels and air lines marked for faster install.  You can adjust slides and set sensors on the bench to save even more time.

Once you have the machine base and table top, look for the best way to route the wires and air-lines and drill holes for tie wrap bases or other mounting plates.  Then start installing the subassemblies at the center and work your way out, be sure to tighten all fasteners and check the fit of moving parts.

When all the subassemblies are installed with sensors and air lines ran, it’s time to do the I.O. check out manually then check them through the P.L.C.  Once I.O. is complete you can start to de-bug and run the machine.